Home Improvements
Page 3
Time for the heavy duty equipement
The inside of the inspection area at the end of the leach bed.
Time for the 3rd layer.
End of the 3rd layer of gravel
Start of the 4th layer of gravel
Pour on the 4th layer
Smoothing out of the 4th layer
Time to smooth things out, an get ready for the distribution box
Home
Page 1
Page 2
Page 4
Page 5